Martin Bichler, Jayant Kalagnanam
EJOR
Planners in the steel industry design a set of steel slabs to satisfy the order book subject to constraints on (1) achieving a total designed weight for each order using multiples of an order-specific production size range, (2) minimum and maximum sizes for each slab, and (3) feasible assignments of multiple orders to the same slab. We developed a heuristic solution based on matchings and bin packing that a large steel plant uses daily in mill operations.
Martin Bichler, Jayant Kalagnanam
EJOR
Ho Soo Lee, Quin-lan Cheng, et al.
Computers and Biomedical Research
M. Bichler, Juhnyoung Lee, et al.
WECWIS 2001
Jayant R. Kalagnanam, Milind W. Dawande, et al.
Operations Research