Chi-Leung Wong, Zehra Sura, et al.
I-SPAN 2002
We consider the open shop, job shop, and flow shop scheduling problems with integral processing times. We give polynomial-time algorithms to determine if an instance has a schedule of length at most 3, and show that deciding if there is a schedule of length at most 4 is NP-complete. The latter result implies that, unless P = NP, there does not exist a polynomial-time approximation algorithm for any of these problems that constructs a schedule with length guaranteed to be strictly less than 5/4 times the optimal length. This work constitutes the first nontrivial theoretical evidence that shop scheduling problems are hard to solve even approximately.
Chi-Leung Wong, Zehra Sura, et al.
I-SPAN 2002
Anupam Gupta, Viswanath Nagarajan, et al.
Operations Research
Sonia Cafieri, Jon Lee, et al.
Journal of Global Optimization
Robert G. Farrell, Catalina M. Danis, et al.
RecSys 2012