Yingdong Lu, Jing-Sheng Song, et al.
IIE Transactions
We study the capacity problem of matching the supply of re- sources and the demand for resources over a planning horizon of N periods, with the provision that a set of resource capacity decisions must be made before the first period. Our analysis relies on a thorough study of the asymptotic behavior of a random walk with power drift.
Yingdong Lu, Jing-Sheng Song, et al.
IIE Transactions
Petar Momčilović, Mark S. Squillante
MobiHoc 2008
Yue Tan, Yingdong Lu, et al.
SIGMETRICS/IFIP 2012
Feng Cheng, Markus Ettl, et al.
Production and Operations Management